RRModels022a

Model Railroads

Page 22a


Maintaining the Green and Growy Stuff

After a long summer of new track, new roads, new wiring, new buildings and multitudinous other tasks, the ground cover got a bit out of hand. The maintenance crew was called in:


Above - Sept 20, 2010 - Ol' Number 7 hooked up to the FTRR work caboose, loaded it with tools, picked up the track crew and headed to the South Loop.




The rest of the crew spent the afternoon admiring the fine job Woody was doing....



Return to the Top 

Return to Model Railroad Index

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>