Model Railroads

Page 19b


The Gazebo – Continued

The other installments

Page 19 – The gazebo build. Good kit, easy to assemble
Page 19a – So what is the shiny thing and how does it make a base?
Page 19b – Wiring the lights
Page 19c – Final installation and the Big Show


Time to begin the next phase – test fit it on the base and then install the lights!

Above – July 11, 2010 – The test fit. It was a long day but it looks good, if I do say so myself.

Above – August 21, 2010 – Back to the basement to install lights. The lights are the two light emitting diodes (LEDs), installed with their reflectors and wiring in the upper structure of the gazebo over the entrance.

Above and below – August 21, 2010 – This 26 gauge, coated copper wire is plenty big for lighting two LEDs, is weather proof and easy to hide.

 

Above – October 5, 2010 – While I was inside making details for the gazebo, some other downtown buildings were also being finished and installed. Note how handy the gazebo concert hall is to a major metropolitan area.


Don't miss the final chapter of this gripping tale! Click on page 19c below……


Page 19 – The gazebo build. Good kit, easy to assemble
Page 19a – So what is the shiny thing and how does it make a base?
Page 19b – Wiring the lights
Page 19c – Final installation and the Big Show


Return to the Top 

Return to Model Railroad Index


Comments

RRModels019b — No Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

HTML tags allowed in your comment: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>